Master Plan Process & Information

A Master Plan is a generalized plan indicating the boundaries of a tract or tracts under common ownership and identifying proposed land use, land-use intensity, and thoroughfare alignment. It is the first or introductory plan for a proposed subdivision that will be developed and recorded in several phases. A Master Plan is required when the property owner intends to develop/subdivide only a portion of a larger tract where the remainder will be developed/subdivided later.

View the Step-by-Step Master Plan Process Guide

  1. Planning


    Physical Address
    550 Landa Street
    New Braunfels, TX 78130

    Phone: (830) 221-4050
    Fax: (830) 608-2109


  1. Step 1 - LOC's
  2. Step 2 - Calculate Fees
  3. Step 3 - Application
  4. Step 4 - Submit

The following Letters of Certification (LOC) are required for a Master Plan to be submitted:

Engineering
Traffic Impact Analysis Process
Preliminary Plat Letter of Certification
   - Application for LOC
   - Checklist for Master Plan LOC
   - Checklist for Traffic Impact Analysis

Once the above items are complete you can submit online via the Permitting Portal
Questions? Contact - engineeringtechs@nbtexas.org or (830) 221-2016

Utility Providers
To include water and wastewater availability, capacity, distance to the existing line(s) from the project.
View Utility Providers and LOC Forms
View Sample LOC

Texas Department of Transportation
As it pertains to Access and Right of Way.
Contact 
TXDOT
View 
Sample LOC

Local Counties
Conditional Approval if installing Private Wellsand/or Onsite Sewage Facilities
Contact Comal County
Contact Guadalupe County